Professional standards are the quiet infrastructure of a discipline, shaping how practitioners work, organizations operate, educators teach, and leaders deliver consistent value at scale. Contributing to them is one of the most meaningful ways to give back to the profession.
Founded in 1969, the Project Management Institute (PMI) is the world's leading authority on project success. Supported by a global community of millions of project professionals and by thousands of corporations, government agencies, and academic institutions, PMI develops widely adopted standards, certifications, and other resources that help organizations deliver projects and transformations effectively and responsibly. Its standards influence project management practice across industries and around the world.
Scott M. Graffius has contributed to seven standards and guides published by the PMI. They include:
These contributions reflect engagement with the discipline at a foundational level, defining and refining methods, terminology, and guidance for practitioners worldwide, and they show Graffius participating in collaborative efforts that help ensure PMI standards remain relevant, practical, and aligned with evolving real-world delivery environments. Across all seven, the throughline is clarity and usability, helping practitioners apply proven guidance while adapting it to diverse contexts, industries, and geographies. Each of the seven standards is highlighted next.
Date of Publication: Scheduled for July 2026
Description
The Agile Practice Guide is a widely adopted reference developed jointly by PMI and the Agile Alliance to help practitioners apply agile and hybrid approaches in organizational environments. It serves as a bridge between predictive project management and adaptive delivery methods, offering guidance on tailoring practices to context rather than prescribing a single methodology. The Second Edition expands this foundation to reflect the increasing complexity of modern product and project ecosystems. It emphasizes adaptability, situational judgment, and alignment between agile principles and enterprise delivery realities. It also reinforces the importance of practical implementation over theoretical purity, helping teams operate effectively across predictive, agile, and hybrid environments.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered the Agile Practice Guide here.
The PMI publication is available on Amazon in paperback format.
Date of Publication: 2026
Description
This standard provides structured guidance for integrating artificial intelligence into portfolio, program, and project management environments. It defines foundational principles, performance domains, and lifecycle considerations for AI-enabled delivery systems. It also addresses governance, ethics, and legal responsibilities, which are increasingly critical as AI becomes embedded in decision-making processes. The standard reflects the need for shared language and structure as organizations adopt AI at scale. It helps practitioners understand not only how AI can enhance portfolio, program, and project delivery, but also how it should be governed responsibly to support effective, ethical, and trustworthy outcomes.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered The Standard for Artificial Intelligence in Portfolio, Program, and Project Management here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats.
Date of Publication: 2025
Description
The PMBOK Guide serves as the global foundation of project management practice across industries and delivery approaches. The Eighth Edition builds on prior editions by refining guidance for predictive, agile, and hybrid environments while expanding coverage of emerging topics such as artificial intelligence, modern governance, and evolving delivery practices. Rather than prescribing a single methodology, it emphasizes principles, adaptability, and value delivery across diverse organizational contexts. The guide helps practitioners tailor approaches to meet the unique needs of projects while remaining aligned with organizational objectives. It reflects the continuing evolution of the profession in response to changing technologies, organizational structures, and ways of working.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Eighth Edition here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats.
Date of Publication: 2019
Description
The Practice Standard for Project Estimating provides structured guidance for developing project estimates that are transparent, consistent, and defensible. It covers a range of estimating approaches, from early conceptual estimates through detailed and definitive estimates that support planning, budgeting, and decision-making. It also highlights the importance of managing uncertainty, assumptions, and risk throughout the estimating process. The standard reinforces the idea that estimating is not a one-time activity but an evolving discipline throughout the project lifecycle. It helps practitioners improve both the accuracy of estimates and the effectiveness of communication with stakeholders and decision-makers.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered The Practice Standard for Project Estimating – Second Edition here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats.
Date of Publication: 2017
Description
The Sixth Edition of the PMBOK Guide represents a major step in the evolution of modern project management practice. It formally incorporates agile, adaptive, and hybrid approaches alongside predictive methods, reflecting the increasing diversity of project delivery environments. It also strengthens the emphasis on tailoring, enabling practitioners to adapt processes based on project context, complexity, and uncertainty. The guide provides a structured yet flexible foundation that supports both practitioners and certification frameworks worldwide. It remains one of the most widely referenced editions in the history of the discipline.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Sixth Edition here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats. (Note: Links are to the current edition.)
Date of Publication: 2017
Description
The Standard for Program Management defines the principles and practices used to manage multiple related projects in a coordinated program structure. It emphasizes aligning program outcomes with organizational strategy while maximizing benefits realization through coordinated governance, stakeholder engagement, and integrated management of related projects. The Fourth Edition strengthens guidance for managing complexity at scale while maintaining strategic alignment across interdependent initiatives. It also provides clearer direction for overseeing cross-project integration and organizational change. The standard helps program managers deliver outcomes that would be difficult (or impossible) to achieve through individual projects alone.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered The Standard for Program Management – Fourth Edition here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats. (Note: Links are to the current edition.)
Date of Publication: 2006
Description
The Practice Standard for Work Breakdown Structures provides foundational guidance for creating and applying work breakdown structures (WBS) in project management practice. It explains how decomposing project scope into manageable deliverables improves planning, estimation, accountability, communication, and project control. The standard reinforces alignment with the broader PMBOK Guide framework and supports consistent application across industries and organizations. It remains one of the foundational references for organizing project deliverables and structuring work. Its principles continue to underpin effective planning and control, including in today's adaptive and agile delivery environments.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered the Practice Standard for Work Breakdown Structures – Second Edition here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats. (Note: Links are to the current edition.)
These seven publications span two decades of PMI's standards development, from the foundational work on work breakdown structures in 2006 to the guidance on artificial intelligence in 2026. Each standard addressed the delivery challenges of its moment, from structuring scope and estimating costs to coordinating programs and integrating agile and AI-driven practices into project management. Contributing to this body of work has provided a firsthand view of how the profession has adapted, and it has been a privilege to help shape the standards that practitioners around the world rely on every day.
Scott M. Graffius has generated over $2.51 billion in business value for Fortune 500 companies and other organizations around the world. Put that track record to work for you. For speaking engagements, use the request form; for other inquiries, email him.
Graffius, S. M. (n.d.). About Scott M. Graffius. https://scottgraffius.com/bio.html
Graffius, S. M. (n.d.). Thought Leader and Influencer. https://www.scottgraffius.com/thoughtleaderandinfluencer.html
Graffius, S. M. (2025, February 12). Scott M. Graffius' Role in Advancing Project Management Institute (PMI) Standards Excellence. https://scottgraffius.com/blog/files/scott-m-graffius-role-in-advancing-project-management-institute-(pmi)-standards.html
Graffius, S. M. (2025, November 13). Scott M. Graffius Contributed to and Reviewed the PMBOK Guide, 8th Edition — the Global Standard for Project Management. ScottGraffius.com. https://doi.org/10.13140/RG.2.2.25557.69601
Graffius, S. M. (2026, June 3). Scott M. Graffius Contributed to the Agile Practice Guide - Second Edition. ScottGraffius.com. https://scottgraffius.com/blog/files/scott-m-graffius-contributed-to-agile-practice-guide-second-edition.html
Graffius, S. M. (2026, June 9). Scott M. Graffius Contributed to The Standard for Artificial Intelligence in Portfolio, Program, and Project Management. ScottGraffius.com. https://scottgraffius.com/blog/files/scott-m-graffius-contributed-to-pmi-standard-for-ai-in-pppm.html
Project Management Institute. (n.d.). https://www.pmi.org
Project Management Institute. (2006). Practice standard for work breakdown structures (2nd ed.). Project Management Institute.
Project Management Institute. (2017). The standard for program management (4th ed.). Project Management Institute.
Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK guide) (6th ed.). Project Management Institute.
Project Management Institute. (2019). The practice standard for project estimating (2nd ed.). Project Management Institute.
Project Management Institute. (2025). A guide to the project management body of knowledge (PMBOK guide) (8th ed.). Project Management Institute.
Project Management Institute. (2026). Agile practice guide (2nd ed.). Project Management Institute.
Project Management Institute. (2026). The Standard for Artificial Intelligence in Portfolio, Program, and Project Management. Project Management Institute.


Scott M. Graffius is a strategic transformation leader who drives AI, Agile, and broader business and technology initiatives to deliver measurable value across projects, programs, portfolios, and PMOs. He is an expert in the teamwork tradecraft of both human and human-AI teams, including the “exotic team dynamics” that emerge. He is also an authority on the temporal patterns of social media, including the half-life of audience engagement.
He’s a practitioner, researcher, thought leader, award-winning author, and keynote speaker who’s taken the stage at 99 conferences and other events across 25 countries.
He’s delivered over $2.51 billion in value for Fortune 500 companies and other leaders in technology, entertainment, financial services, healthcare, and beyond.
Businesses, professional associations, government agencies, and universities use Graffius and feature his work. Examples include Adobe, Bayer, Boston University, Ford, Gartner, Harvard Medical School, IEEE, Johns Hopkins University, Microsoft, MSN, National Academy of Sciences, Oracle, Pinterest Inc., Project Management Institute, UC San Diego, Verizon, Yale University, and others.
The following sections provide additional information on his experience, contributions, and influence.
Experience
Graffius heads the professional services firm Exceptional PPM and PMO Solutions, along with its subsidiary Exceptional Agility. These consultancies offer strategic and tactical advisory, training, embedded expertise, and consulting services to the public, private, and government sectors. They help organizations enhance their capabilities and results in agile, project management, program management, portfolio management, and PMO leadership, supporting innovation and driving competitive advantage. The consultancies confidently back services with a Delighted Client Guarantee™.
Graffius is a former VP of project management with a publicly traded provider of diverse consumer products and services over the Internet. Before that, he ran and supervised the delivery of projects and programs in public and private organizations with businesses ranging from e-commerce to advanced technology products and services, retail, manufacturing, entertainment, and more.
He has experience with consumer, business, reseller, government, and international markets.
Award-Winning Author
Graffius has authored three books.
International Public Speaker
Organizations worldwide engage Graffius to present on tech (including AI), Agile, project management, program management, portfolio management, and PMO leadership. He crafts and delivers unique and compelling talks and workshops. Graffius has conducted 99 sessions across 25 countries. Select examples of events include Agile Trends Gov, BSides (Newcastle Upon Tyne), Conf42 Quantum Computing, DevDays Europe, DevOps Institute, DevOpsDays (Geneva), Frug’Agile, IEEE, Microsoft, Scottish Summit, Scrum Alliance RSG (Nepal), Techstars, and W Love Games International Video Game Development Conference (Helsinki), and more.
With an average rating of 4.81 (on a scale of 1-5), sessions are highly valued.
The speaker engagement request form is here.
Thought Leadership and Influence
Prominent businesses, professional associations, government agencies, and universities have showcased Graffius and his contributions—spanning his books, talks, workshops, and beyond. Select examples include:
Graffius has played a key role in the Project Management Institute (PMI) in developing professional standards. He was a member of multiple teams that authored, reviewed, and produced:
He was also a subject matter expert reviewer of content for the PMI’s Congress. Beyond the PMI, Graffius also served as a member of the review team for two of the Scrum Alliance’s Global Scrum Gatherings.
Acclaimed Authority on Teamwork Tradecraft

Graffius is a renowned authority on teamwork tradecraft. Informed by the research of Bruce W. Tuckman and Mary Ann C. Jensen, over 150 subsequent studies, and Graffius' first-hand professional experience with, and analysis of, team leadership and performance, Graffius created his "Phases of Team Development" intellectual property as a unique perspective and visual conveying the five phases of team development. First introduced in 2008 and periodically updated, his work provides a diagnostic and strategic guide for navigating team dynamics. It provides actionable insights for leaders across industries to develop high-performance teams. Its adoption by esteemed organizations such as Yale University, IEEE, Cisco, Microsoft, Ford, Oracle, Broadcom, the U.S. National Park Service, and the Journal of Neurosurgery, among others, highlights its utility and value, solidifying its status as an indispensable resource for elevating team performance and driving organizational excellence. In 2026, Graffius added human-AI teamwork—including the "exotic team dynamics" which emerge when advanced AI collaborates as a teammate—to his "Phases of Team Development."
The 2026 edition of Graffius' "Phases of Team Development" intellectual property is here.
Expert on Temporal Dynamics on Social Media Platforms

Graffius is also an authority on temporal dynamics on social media platforms. His "Lifespan (Half-Life) of Social Media Posts" research—first published in 2018 and updated annually—delivers a precise quantitative analysis of post longevity across digital platforms, utilizing advanced statistical techniques to determine mean half-life with precision. It establishes a solid empirical base, effectively highlighting the ephemeral nature of content within social media ecosystems. Referenced and applied by leading entities—such as Fast Company, GoDaddy, Journal of Hand Surgery (European Volume), Ministère de la Culture (French Ministry of Culture), Pinterest Inc., PNAS, and Telecommunications Policy, among others—his research exemplifies methodological rigor and sustained significance in the field of digital informatics.
The 2026 edition of Graffius "Lifespan (Half-Life) of Social Media Posts" research is here.
Education and Professional Certifications
Graffius has a bachelor’s degree in psychology with a focus in Human Factors. He holds eight professional certifications:
He is an active member of the Scrum Alliance, the Project Management Institute (PMI), and the Institute of Electrical and Electronics Engineers (IEEE).
Advancing AI, Agile, and Project/PMO Management
Scott M. Graffius continues to advance the fields of AI, Agile, and Project/PMO Management through his leadership, research, writing, and real-world impact. Businesses and other organizations leverage Graffius’ insights to drive their success.
Discover Scott’s Books
Connect with and follow Scott on LinkedIn, X, YouTube, Facebook, Threads, Bluesky, Mastodon, and ResearchGate.













You may be interested in these stories.
Government of Canada Features Research by Scott M. Graffius
"Strategic Business Research" Journal Cites Work of Scott M. Graffius
IEEE Access Publication Features Scott M. Graffius’ Research on the Half-Life of Social Media
The Agile Coach: 2026 Edition
Scott M. Graffius’ Work Cited in International Peer-Reviewed Journal on Digital Transformation
Phases of Team Development in Elite Sport
A Critical Analysis of COVID-19 Treatment Search Trends and Media Coverage Study Citing Scott M. Graffius' Work
Human-AI Teamwork: Master the Exotic Team Dynamics That Emerge When Collaborating with Advanced AI -- Or Be Outplayed
"Agile Scrum" by Scott M. Graffius Now Featured on Grokipedia
UNSW Aerospace Engineering Course Features Scott M. Graffius' "Phases of Team Development"
Thinkers360 Honors Scott M. Graffius as a 2026 Top Agile Thought Leader
Agile's Journey Through the Decades: Update for 2026
BMC Software Features Content from Scott M. Graffius' Book
Peer-Reviewed Journal Cited Work of Scott M. Graffius
University of Waterloo Features Graffius' "Phases of Team Development" in Course Materials
Perplexity Standalone Article on AI Hallucinations Cites Research by Scott M. Graffius
Handling the Saboteur Within: Lessons from a 3-Letter Agency on Spotting and Stopping Intentional and Unintentional Sabotage
A Deep Dive Into the Typical Engagement Pattern for Social Media Posts
Most Valuable IT Certifications: Update for 2026
"Marketing in the Metaverse" Spotlights Scott M. Graffius’ Research on the Half-Life of Social Media
University of Greenwich Features Graffius' Phases of Team Development
10 Essential Agile Books: Curated Recommendations for Agile Professionals
Lifespan (Half-Life) of Social Media Posts: Update for 2026
Scott M. Graffius' Research on the Half-Life of Social Media was Cited in a Peer-Reviewed Study Published in Telecommunications Policy, a Leading Academic Journal
Are AI Hallucinations Getting Better or Worse? We Analyzed the Data
Scott M. Graffius' Phases of Team Development - Applied to Human Teams and Human-AI Teams: 2026 Update
Lessons from Yesterday’s Tomorrowland
Scott M. Graffius’ Update to His "Phases of Team Development” Coming Early 2026
A Data-Driven Analysis of the Evolution of Project Management: Tasks, Trends, and AI
Actionable Insights. Global Impact. Scott M. Graffius.
Beep Beep! Why Wile E. Coyote Is the Patron Saint of AI Failure
Social Media Half-Life Research Cited in Prestigious Peer-Reviewed Medical Journal
Navigating the Spectrum of Advanced AI – Agentic, Autonomous, and Autopoietic
Lessons from Unhinged AI in Fiction: What Rogue AIs in Sci-Fi Storytelling, Films, and TV Shows Reveal About Us
Scott M. Graffius Contributed to and Reviewed the PMBOK Guide, 8th Edition — the Global Standard for Project Management
UK Sports Institute Features Teamwork and Leadership Work of Scott M. Graffius
Definitions of Advanced AIs: Agentic, Autonomous, and Autopoietic
HAN University of Applied Sciences Features the Work of Scott M. Graffius
Gifts That Inspire Joy
Evergreen Echoes: How Pinterest Inc. and Pinterest Japan Spotlighted Scott M. Graffius’ Research on the Half-Life of Social Media Content
Scott M. Graffius’ Team Development Work Lights Up the University of Tasmania’s Curriculum
Taiwan’s Leading Outlet for Technology and Innovation Spotlights Graffius’ Research on Social Media Temporal Dynamics
Scott M. Graffius’ Insights on AI, Agile, Gaming, XR, and Defense Transformation Cited by MSN in Their Coverage of Innovation and Leadership in the Sector
Top Predictions of 2024, Tested in 2025
Government of Finland Agency Features Graffius' Phases of Team Development IP
Scott M. Graffius Premieres His New "Exotic Team Dynamics: Human-AI Collaboration" Talk at Corporate Event in Las Vegas
Environmental Science Journal References Scott M. Graffius’ Project Management Work
AI Institute of Switzerland Features Scott M. Graffius’ Work on Algorithms
Exotic Team Dynamics: The New Frontier of Human–AI Collaboration
Scott M. Graffius’ Work Featured at ACM DIS ’25
Climbing the Ladder: The Head of Agile/PMO’s Organizational Proximity to the CEO is Closer Than Ever
Harness Sci-Fi and Speculative Design While Embracing Imperfection to Drive Innovation and Proactively Predict and Prepare for the Future
Scott M. Graffius’ “Agile Scrum” Book Featured in a Publication of the Associação Nacional de Educação Católica do Brasil (ANEC)
Setting Direction with OKRs and Tracking Progress with KPIs: A Guide for Agile, Project Management, and Tech Teams
AI Showcase Showdown: Ranking AI Accuracy on Project Management Basics
BookAuthority Features “Agile Scrum” by Scott M. Graffius in “10 Agile Software Development Books That Define the Field”
Exploring Team Dynamics, Adaptability, and Creative Problem-Solving Through Felix the Cat’s Metaphorical Toolkit
Mind Games and Master Plans: How PsyOps Exploit Psychological Phenomena
The “Pants-on-Fire Index for AI”
16 Causes of Technical Debt and How to Avoid It
PMI’s Infinity AI Gets the Basics of Team Development Alarmingly and Repeatedly Wrong
Agile for Unicorns: 7 Keys to Thrive; Scott M. Graffius’ Workshop
Scott M. Graffius’ “Agile Scrum: Your Quick Start Guide with Step-by-Step Instructions” Featured in Prestigious National Academies of Sciences Publication
Meta and Anduril’s EagleEye and the Future of XR: How Gaming, AI, and Agile Are Transforming Defense
"Agile Protocol" and the Power of Satire, Parody, and Humor
AI in Agile: Benefits, Risks, Outlook
Hostinger Highlights Scott M. Graffius’ “Agile Protocol” Book in Feature on Software Projects
French Ministry of Culture Links to Scott M. Graffius Research in Their Guide for Responsible Digital Communication
National Science Foundation’s LTER Network Features Scott M. Graffius’ Phases of Team Development IP
Waterfall vs. Agile: What’s Fixed, What’s Flexible, and Why It Matters
Scott M. Graffius Delivering $2.3 Billion in Value Through AI, Agile, and Project/PMO Leadership
The Problem with Heroes in Agile
The 3 Vital Rules of Science: What They Are and Why They Matter
“Agile Protocol: The Transformation Ultimatum” Lands on the Amazon Best Sellers List!
Scott M. Graffius Recognized as a Top Thought Leader in Digital Disruption by Thinkers360
“Agile Protocol: The Transformation Ultimatum” by Scott M. Graffius Crashes the Book Scene with Satirical Firepower
NCKU in Taiwan Integrates Graffius' 'Phases of Team Development' into Its Curriculum
The Art and Science of Aligning Initiatives with Strategic Objectives
RGPV University Adds Scott M. Graffius’ "Agile Scrum: Your Quick Start Guide with Step-by-Step Instructions" to Its Syllabus
Introducing ‘Engage or Fade: Decoding the Half-Life of Digital Resonance’ – A New Talk by Scott M. Graffius
Dropbox Company (Nira) Taps into Scott M. Graffius’ Expertise in Strategic Planning
Reporting Errors in a Publication: A Case Study on ‘Frontiers in Public Health’
NESEA Conference Session on Innovation Highlights Scott M. Graffius' 'Phases of Team Development'
U.S. Soccer Scores with Scott M. Graffius' Intellectual Property on Teamwork
U.S. Department of Commerce Partner (IEDC) Features Scott M. Graffius’ Intellectual Property
How Long Do Your Posts Live? AI Critiques Scott M. Graffius’ Research on the Half-Life of Social Media
Agile's Journey Through the Decades
Scott M. Graffius' Role in Advancing Project Management Institute (PMI) Standards Excellence
Most Valuable IT Certifications: Update for 2025
The PMI + Agile Alliance Merger: A Recipe for Success?
When Agile, AI, and Strategic Thinking Converge
Scott M. Graffius’ Phases of Team Development: 2025 Update
Lifespan (Half-Life) of Social Media Posts: Update for 2025
Verizon Features Scott M. Graffius
Do Not Read This Article! An Exploration of the Streisand Effect and Other Phenomena
Scott M. Graffius' 'Phases of Team Development' was Spotlighted in Journal of Neurosurgery
Pinterest Japan Uses Graffius’ Research on Temporal Dynamics on Social Media Platforms
Hochschule Coburg (Coburg University) Germany Uses Scott M. Graffius’ Phases of Team Development IP in Coursework on Agile Development
Wild World of Team Dynamics [Updated Two-Minute Video]
EU Europass Teacher Academy Features Scott M. Graffius’ ‘Phases of Team Development’ in Leadership Training
Side-by-Side Comparison of Retrospectives and Hot Washes
Constructor University 2024 Advanced Software Technology Handbook References Scott M. Graffius' Work on Team Dynamics
Strategies for Medical Team Success Featured Scott M. Graffius’ ‘Phases of Team Development’ Intellectual Property
SBG Neumark — Europe’s Largest Distribution Transformer Plant — Powers Up with Scott M. Graffius’ Intellectual Property
Scott M. Graffius’ Intellectual Property was Employed by the NHS — the Largest Single-Payer Healthcare System in Europe
Luxury Unwrapped: The Ultimate Holiday Gift Guide for Every Budget
Singapore Institute of Technology Features Work of Scott M. Graffius
Tufts University Features Scott M. Graffius 'Phases of Team Development' Intellectual Property
'Cat Herders': Retelling the Massive Success Story
Pennsylvania State Agency Used Scott M. Graffius' Intellectual Property
Copyright Infringement in a Book Published by AuthorHouse / Author Solutions / The Najafi Companies: Publisher Fails to Respond or Take Required Action
Pinterest Inc. References Scott M. Graffius’ Research
Bournemouth University Used Scott M. Graffius’ Intellectual Property
‘Comparative Methodological Guidelines: Handbook for Educators’ Violates Scott M. Graffius’ Copyright
Japan Backlog User Group Event Featured Scott M. Graffius’ ‘Phases of Team Development’
TurningWest's 'Trial'
Radio Silence from the American Association of Neurological Surgeons on Report of Blatant Plagiarism in Their ‘Journal of Neurosurgery’ Publication
Supplement to Graffius' 'Lifespan (Half-Life) of Social Media Posts' Research: Typical Engagement Distribution Pattern for Social Media Posts
How Algorithms Shape the User Experience on Social Media Platforms
Thinkers360 Named Scott M. Graffius a Top Thought Leader on Agile
More articles are listed here.

Graffius, S. M. (2026, July 6). Scott M. Graffius Contributed to Seven Project Management Institute (PMI) Standards. ScottGraffius.com. https://scottgraffius.com/blog/files/scott-m-graffius-contributed-to-7-pmi-standards.html

(Coming soon)

Project Management Institute (PMI) name, mark, and content are the property of PMI.
Graffius’ article includes limited excerpts of PMI publications, attributed and used under fair use doctrine for purposes of news reporting, commentary, and analysis.


If there are any supplements or updates to this article after the date of publication, they will appear here.

Copyright © Scott M. Graffius. All rights reserved.
Content on this site—including text, images, videos, and data—may not be used for training or input into any artificial intelligence, machine learning, or automatized learning systems, or published, broadcast, rewritten, or redistributed without the express written permission of Scott M. Graffius.


Graffius, S. M. (2026, July 6). Scott M. Graffius Contributed to Seven Project Management Institute (PMI) Standards. ScottGraffius.com. https://scottgraffius.com/blog/files/scott-m-graffius-contributed-to-7-pmi-standards.html
Introduction
Professional standards are the quiet infrastructure of a discipline, shaping how practitioners work, organizations operate, educators teach, and leaders deliver consistent value at scale. Contributing to them is one of the most meaningful ways to give back to the profession.
Founded in 1969, the Project Management Institute (PMI) is the world's leading authority on project success. Supported by a global community of millions of project professionals and by thousands of corporations, government agencies, and academic institutions, PMI develops widely adopted standards, certifications, and other resources that help organizations deliver projects and transformations effectively and responsibly. Its standards influence project management practice across industries and around the world.
Scott M. Graffius has contributed to seven standards and guides published by the PMI. They include:
- Agile Practice Guide – Second Edition (2026)
- The Standard for Artificial Intelligence in Portfolio, Program, and Project Management (2026)
- A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Eighth Edition (2025)
- The Practice Standard for Project Estimating – Second Edition (2019)
- A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Sixth Edition (2017)
- The Standard for Program Management – Fourth Edition (2017)
- Practice Standard for Work Breakdown Structures – Second Edition (2006)
These contributions reflect engagement with the discipline at a foundational level, defining and refining methods, terminology, and guidance for practitioners worldwide, and they show Graffius participating in collaborative efforts that help ensure PMI standards remain relevant, practical, and aligned with evolving real-world delivery environments. Across all seven, the throughline is clarity and usability, helping practitioners apply proven guidance while adapting it to diverse contexts, industries, and geographies. Each of the seven standards is highlighted next.
1. Agile Practice Guide – Second Edition (2026)
Date of Publication: Scheduled for July 2026
Description
The Agile Practice Guide is a widely adopted reference developed jointly by PMI and the Agile Alliance to help practitioners apply agile and hybrid approaches in organizational environments. It serves as a bridge between predictive project management and adaptive delivery methods, offering guidance on tailoring practices to context rather than prescribing a single methodology. The Second Edition expands this foundation to reflect the increasing complexity of modern product and project ecosystems. It emphasizes adaptability, situational judgment, and alignment between agile principles and enterprise delivery realities. It also reinforces the importance of practical implementation over theoretical purity, helping teams operate effectively across predictive, agile, and hybrid environments.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered the Agile Practice Guide here.
The PMI publication is available on Amazon in paperback format.
2. The Standard for Artificial Intelligence in Portfolio, Program, and Project Management (2026)
Date of Publication: 2026
Description
This standard provides structured guidance for integrating artificial intelligence into portfolio, program, and project management environments. It defines foundational principles, performance domains, and lifecycle considerations for AI-enabled delivery systems. It also addresses governance, ethics, and legal responsibilities, which are increasingly critical as AI becomes embedded in decision-making processes. The standard reflects the need for shared language and structure as organizations adopt AI at scale. It helps practitioners understand not only how AI can enhance portfolio, program, and project delivery, but also how it should be governed responsibly to support effective, ethical, and trustworthy outcomes.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered The Standard for Artificial Intelligence in Portfolio, Program, and Project Management here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats.
3. A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Eighth Edition (2025)
Date of Publication: 2025
Description
The PMBOK Guide serves as the global foundation of project management practice across industries and delivery approaches. The Eighth Edition builds on prior editions by refining guidance for predictive, agile, and hybrid environments while expanding coverage of emerging topics such as artificial intelligence, modern governance, and evolving delivery practices. Rather than prescribing a single methodology, it emphasizes principles, adaptability, and value delivery across diverse organizational contexts. The guide helps practitioners tailor approaches to meet the unique needs of projects while remaining aligned with organizational objectives. It reflects the continuing evolution of the profession in response to changing technologies, organizational structures, and ways of working.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Eighth Edition here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats.
4. The Practice Standard for Project Estimating – Second Edition (2019)
Date of Publication: 2019
Description
The Practice Standard for Project Estimating provides structured guidance for developing project estimates that are transparent, consistent, and defensible. It covers a range of estimating approaches, from early conceptual estimates through detailed and definitive estimates that support planning, budgeting, and decision-making. It also highlights the importance of managing uncertainty, assumptions, and risk throughout the estimating process. The standard reinforces the idea that estimating is not a one-time activity but an evolving discipline throughout the project lifecycle. It helps practitioners improve both the accuracy of estimates and the effectiveness of communication with stakeholders and decision-makers.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered The Practice Standard for Project Estimating – Second Edition here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats.
5. A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Sixth Edition (2017)
Date of Publication: 2017
Description
The Sixth Edition of the PMBOK Guide represents a major step in the evolution of modern project management practice. It formally incorporates agile, adaptive, and hybrid approaches alongside predictive methods, reflecting the increasing diversity of project delivery environments. It also strengthens the emphasis on tailoring, enabling practitioners to adapt processes based on project context, complexity, and uncertainty. The guide provides a structured yet flexible foundation that supports both practitioners and certification frameworks worldwide. It remains one of the most widely referenced editions in the history of the discipline.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Sixth Edition here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats. (Note: Links are to the current edition.)
6. The Standard for Program Management – Fourth Edition (2017)
Date of Publication: 2017
Description
The Standard for Program Management defines the principles and practices used to manage multiple related projects in a coordinated program structure. It emphasizes aligning program outcomes with organizational strategy while maximizing benefits realization through coordinated governance, stakeholder engagement, and integrated management of related projects. The Fourth Edition strengthens guidance for managing complexity at scale while maintaining strategic alignment across interdependent initiatives. It also provides clearer direction for overseeing cross-project integration and organizational change. The standard helps program managers deliver outcomes that would be difficult (or impossible) to achieve through individual projects alone.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered The Standard for Program Management – Fourth Edition here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats. (Note: Links are to the current edition.)
7. Practice Standard for Work Breakdown Structures – Second Edition (2006)
Date of Publication: 2006
Description
The Practice Standard for Work Breakdown Structures provides foundational guidance for creating and applying work breakdown structures (WBS) in project management practice. It explains how decomposing project scope into manageable deliverables improves planning, estimation, accountability, communication, and project control. The standard reinforces alignment with the broader PMBOK Guide framework and supports consistent application across industries and organizations. It remains one of the foundational references for organizing project deliverables and structuring work. Its principles continue to underpin effective planning and control, including in today's adaptive and agile delivery environments.
The following visual includes excerpts from the publication highlighting contributors, including Graffius.

For background, Graffius previously covered the Practice Standard for Work Breakdown Structures – Second Edition here.
The PMI publication is available on Amazon in paperback and Kindle/ebook formats. (Note: Links are to the current edition.)
Conclusion
These seven publications span two decades of PMI's standards development, from the foundational work on work breakdown structures in 2006 to the guidance on artificial intelligence in 2026. Each standard addressed the delivery challenges of its moment, from structuring scope and estimating costs to coordinating programs and integrating agile and AI-driven practices into project management. Contributing to this body of work has provided a firsthand view of how the profession has adapted, and it has been a privilege to help shape the standards that practitioners around the world rely on every day.
Scott M. Graffius has generated over $2.51 billion in business value for Fortune 500 companies and other organizations around the world. Put that track record to work for you. For speaking engagements, use the request form; for other inquiries, email him.
Bibliography
Graffius, S. M. (n.d.). About Scott M. Graffius. https://scottgraffius.com/bio.html
Graffius, S. M. (n.d.). Thought Leader and Influencer. https://www.scottgraffius.com/thoughtleaderandinfluencer.html
Graffius, S. M. (2025, February 12). Scott M. Graffius' Role in Advancing Project Management Institute (PMI) Standards Excellence. https://scottgraffius.com/blog/files/scott-m-graffius-role-in-advancing-project-management-institute-(pmi)-standards.html
Graffius, S. M. (2025, November 13). Scott M. Graffius Contributed to and Reviewed the PMBOK Guide, 8th Edition — the Global Standard for Project Management. ScottGraffius.com. https://doi.org/10.13140/RG.2.2.25557.69601
Graffius, S. M. (2026, June 3). Scott M. Graffius Contributed to the Agile Practice Guide - Second Edition. ScottGraffius.com. https://scottgraffius.com/blog/files/scott-m-graffius-contributed-to-agile-practice-guide-second-edition.html
Graffius, S. M. (2026, June 9). Scott M. Graffius Contributed to The Standard for Artificial Intelligence in Portfolio, Program, and Project Management. ScottGraffius.com. https://scottgraffius.com/blog/files/scott-m-graffius-contributed-to-pmi-standard-for-ai-in-pppm.html
Project Management Institute. (n.d.). https://www.pmi.org
Project Management Institute. (2006). Practice standard for work breakdown structures (2nd ed.). Project Management Institute.
Project Management Institute. (2017). The standard for program management (4th ed.). Project Management Institute.
Project Management Institute. (2017). A guide to the project management body of knowledge (PMBOK guide) (6th ed.). Project Management Institute.
Project Management Institute. (2019). The practice standard for project estimating (2nd ed.). Project Management Institute.
Project Management Institute. (2025). A guide to the project management body of knowledge (PMBOK guide) (8th ed.). Project Management Institute.
Project Management Institute. (2026). Agile practice guide (2nd ed.). Project Management Institute.
Project Management Institute. (2026). The Standard for Artificial Intelligence in Portfolio, Program, and Project Management. Project Management Institute.

About Scott M. Graffius

Scott M. Graffius is a strategic transformation leader who drives AI, Agile, and broader business and technology initiatives to deliver measurable value across projects, programs, portfolios, and PMOs. He is an expert in the teamwork tradecraft of both human and human-AI teams, including the “exotic team dynamics” that emerge. He is also an authority on the temporal patterns of social media, including the half-life of audience engagement.
He’s a practitioner, researcher, thought leader, award-winning author, and keynote speaker who’s taken the stage at 99 conferences and other events across 25 countries.
He’s delivered over $2.51 billion in value for Fortune 500 companies and other leaders in technology, entertainment, financial services, healthcare, and beyond.
Businesses, professional associations, government agencies, and universities use Graffius and feature his work. Examples include Adobe, Bayer, Boston University, Ford, Gartner, Harvard Medical School, IEEE, Johns Hopkins University, Microsoft, MSN, National Academy of Sciences, Oracle, Pinterest Inc., Project Management Institute, UC San Diego, Verizon, Yale University, and others.
The following sections provide additional information on his experience, contributions, and influence.
Experience
Graffius heads the professional services firm Exceptional PPM and PMO Solutions, along with its subsidiary Exceptional Agility. These consultancies offer strategic and tactical advisory, training, embedded expertise, and consulting services to the public, private, and government sectors. They help organizations enhance their capabilities and results in agile, project management, program management, portfolio management, and PMO leadership, supporting innovation and driving competitive advantage. The consultancies confidently back services with a Delighted Client Guarantee™.
Graffius is a former VP of project management with a publicly traded provider of diverse consumer products and services over the Internet. Before that, he ran and supervised the delivery of projects and programs in public and private organizations with businesses ranging from e-commerce to advanced technology products and services, retail, manufacturing, entertainment, and more.
He has experience with consumer, business, reseller, government, and international markets.
Award-Winning Author
Graffius has authored three books.
- Agile Scrum: Your Quick Start Guide with Step-by-Step Instructions, his first book, earned 17 awards.
- Agile Transformation: A Brief Story of How an Entertainment Company Developed New Capabilities and Unlocked Business Agility to Thrive in an Era of Rapid Change, his second book, was named one of the best Scrum books of all time by BookAuthority.
- Agile Protocol: The Transformation Ultimatum, his third book and his first work of fiction, was released in April 2025. The book trailer is on YouTube.
International Public Speaker
Organizations worldwide engage Graffius to present on tech (including AI), Agile, project management, program management, portfolio management, and PMO leadership. He crafts and delivers unique and compelling talks and workshops. Graffius has conducted 99 sessions across 25 countries. Select examples of events include Agile Trends Gov, BSides (Newcastle Upon Tyne), Conf42 Quantum Computing, DevDays Europe, DevOps Institute, DevOpsDays (Geneva), Frug’Agile, IEEE, Microsoft, Scottish Summit, Scrum Alliance RSG (Nepal), Techstars, and W Love Games International Video Game Development Conference (Helsinki), and more.
With an average rating of 4.81 (on a scale of 1-5), sessions are highly valued.
The speaker engagement request form is here.
Thought Leadership and Influence
Prominent businesses, professional associations, government agencies, and universities have showcased Graffius and his contributions—spanning his books, talks, workshops, and beyond. Select examples include:
- Adobe,
- American Management Association,
- Amsterdam Public Health Research Institute,
- Bayer,
- BMC Software,
- Boston University,
- Broadcom,
- Cisco,
- Coburg University of Applied Sciences and Arts - Germany,
- Computer Weekly,
- Constructor University - Germany,
- Data Governance Success,
- Deimos Aerospace,
- DevOps Institute,
- Dropbox,
- EU's European Commission,
- Ford Motor Company,
- Gartner,
- GoDaddy,
- Harvard Medical School,
- Hasso Plattner Institute - Germany,
- IEEE,
- Innovation Project Management,
- Johns Hopkins University,
- Journal of Neurosurgery,
- Lam Research (Semiconductors),
- Leadership Worthy,
- Life Sciences Trainers and Educators Network,
- London South Bank University,
- Microsoft,
- MSN,
- NASSCOM,
- National Academy of Sciences,
- New Zealand Government,
- Oracle,
- Pinterest Inc.,
- Project Management Institute,
- Mary Raum (Professor of National Security Affairs, United States Naval War College),
- SANS Institute,
- SBG Neumark - Germany,
- Singapore Institute of Technology,
- Torrens University - Australia,
- TBS Switzerland,
- Tufts University,
- UC San Diego,
- UK Sports Institute,
- University of Galway - Ireland,
- US Department of Energy,
- US National Park Service,
- US Soccer,
- US Tennis Association,
- Verizon,
- Wrike,
- Yale University,
- and many others.
Graffius has played a key role in the Project Management Institute (PMI) in developing professional standards. He was a member of multiple teams that authored, reviewed, and produced:
- The Standard for Artificial Intelligence in Portfolio, Program, and Project Management
- Agile Practice Guide – Second Edition
- A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Eighth Edition
- A Guide to the Project Management Body of Knowledge (PMBOK Guide) – Sixth Edition
- The Standard for Program Management – Fourth Edition
- Practice Standard for Work Breakdown Structures – Second Edition
- The Practice Standard for Project Estimating – Second Edition
He was also a subject matter expert reviewer of content for the PMI’s Congress. Beyond the PMI, Graffius also served as a member of the review team for two of the Scrum Alliance’s Global Scrum Gatherings.
Acclaimed Authority on Teamwork Tradecraft

Graffius is a renowned authority on teamwork tradecraft. Informed by the research of Bruce W. Tuckman and Mary Ann C. Jensen, over 150 subsequent studies, and Graffius' first-hand professional experience with, and analysis of, team leadership and performance, Graffius created his "Phases of Team Development" intellectual property as a unique perspective and visual conveying the five phases of team development. First introduced in 2008 and periodically updated, his work provides a diagnostic and strategic guide for navigating team dynamics. It provides actionable insights for leaders across industries to develop high-performance teams. Its adoption by esteemed organizations such as Yale University, IEEE, Cisco, Microsoft, Ford, Oracle, Broadcom, the U.S. National Park Service, and the Journal of Neurosurgery, among others, highlights its utility and value, solidifying its status as an indispensable resource for elevating team performance and driving organizational excellence. In 2026, Graffius added human-AI teamwork—including the "exotic team dynamics" which emerge when advanced AI collaborates as a teammate—to his "Phases of Team Development."
The 2026 edition of Graffius' "Phases of Team Development" intellectual property is here.
Expert on Temporal Dynamics on Social Media Platforms

Graffius is also an authority on temporal dynamics on social media platforms. His "Lifespan (Half-Life) of Social Media Posts" research—first published in 2018 and updated annually—delivers a precise quantitative analysis of post longevity across digital platforms, utilizing advanced statistical techniques to determine mean half-life with precision. It establishes a solid empirical base, effectively highlighting the ephemeral nature of content within social media ecosystems. Referenced and applied by leading entities—such as Fast Company, GoDaddy, Journal of Hand Surgery (European Volume), Ministère de la Culture (French Ministry of Culture), Pinterest Inc., PNAS, and Telecommunications Policy, among others—his research exemplifies methodological rigor and sustained significance in the field of digital informatics.
The 2026 edition of Graffius "Lifespan (Half-Life) of Social Media Posts" research is here.
Education and Professional Certifications
Graffius has a bachelor’s degree in psychology with a focus in Human Factors. He holds eight professional certifications:
- Certified SAFe 6 Agilist (SA),
- Certified Scrum Professional - ScrumMaster (CSP-SM),
- Certified Scrum Professional - Product Owner (CSP-PO),
- Certified ScrumMaster (CSM),
- Certified Scrum Product Owner (CSPO),
- Project Management Professional (PMP),
- Lean Six Sigma Green Belt (LSSGB), and
- IT Service Management Foundation (ITIL).
He is an active member of the Scrum Alliance, the Project Management Institute (PMI), and the Institute of Electrical and Electronics Engineers (IEEE).
Advancing AI, Agile, and Project/PMO Management
Scott M. Graffius continues to advance the fields of AI, Agile, and Project/PMO Management through his leadership, research, writing, and real-world impact. Businesses and other organizations leverage Graffius’ insights to drive their success.
Discover Scott’s Books
- Agile Scrum: Your Quick Start Guide with Step-by-Step Instructions — Deliver Products in Short Cycles with Rapid Adaptation to Change, Fast Time-to-Market, and Continuous Improvement
- Agile Transformation: A Brief Story of How an Entertainment Company Developed New Capabilities and Unlocked Business Agility to Thrive in an Era of Rapid Change
- Agile Protocol: The Transformation Ultimatum
Connect with and follow Scott on LinkedIn, X, YouTube, Facebook, Threads, Bluesky, Mastodon, and ResearchGate.












Sign up for Miro—it's free!
(Want more features? You can always upgrade to a paid plan.)

List of Additional Articles
You may be interested in these stories.
Government of Canada Features Research by Scott M. Graffius
"Strategic Business Research" Journal Cites Work of Scott M. Graffius
IEEE Access Publication Features Scott M. Graffius’ Research on the Half-Life of Social Media
The Agile Coach: 2026 Edition
Scott M. Graffius’ Work Cited in International Peer-Reviewed Journal on Digital Transformation
Phases of Team Development in Elite Sport
A Critical Analysis of COVID-19 Treatment Search Trends and Media Coverage Study Citing Scott M. Graffius' Work
Human-AI Teamwork: Master the Exotic Team Dynamics That Emerge When Collaborating with Advanced AI -- Or Be Outplayed
"Agile Scrum" by Scott M. Graffius Now Featured on Grokipedia
UNSW Aerospace Engineering Course Features Scott M. Graffius' "Phases of Team Development"
Thinkers360 Honors Scott M. Graffius as a 2026 Top Agile Thought Leader
Agile's Journey Through the Decades: Update for 2026
BMC Software Features Content from Scott M. Graffius' Book
Peer-Reviewed Journal Cited Work of Scott M. Graffius
University of Waterloo Features Graffius' "Phases of Team Development" in Course Materials
Perplexity Standalone Article on AI Hallucinations Cites Research by Scott M. Graffius
Handling the Saboteur Within: Lessons from a 3-Letter Agency on Spotting and Stopping Intentional and Unintentional Sabotage
A Deep Dive Into the Typical Engagement Pattern for Social Media Posts
Most Valuable IT Certifications: Update for 2026
"Marketing in the Metaverse" Spotlights Scott M. Graffius’ Research on the Half-Life of Social Media
University of Greenwich Features Graffius' Phases of Team Development
10 Essential Agile Books: Curated Recommendations for Agile Professionals
Lifespan (Half-Life) of Social Media Posts: Update for 2026
Scott M. Graffius' Research on the Half-Life of Social Media was Cited in a Peer-Reviewed Study Published in Telecommunications Policy, a Leading Academic Journal
Are AI Hallucinations Getting Better or Worse? We Analyzed the Data
Scott M. Graffius' Phases of Team Development - Applied to Human Teams and Human-AI Teams: 2026 Update
Lessons from Yesterday’s Tomorrowland
Scott M. Graffius’ Update to His "Phases of Team Development” Coming Early 2026
A Data-Driven Analysis of the Evolution of Project Management: Tasks, Trends, and AI
Actionable Insights. Global Impact. Scott M. Graffius.
Beep Beep! Why Wile E. Coyote Is the Patron Saint of AI Failure
Social Media Half-Life Research Cited in Prestigious Peer-Reviewed Medical Journal
Navigating the Spectrum of Advanced AI – Agentic, Autonomous, and Autopoietic
Lessons from Unhinged AI in Fiction: What Rogue AIs in Sci-Fi Storytelling, Films, and TV Shows Reveal About Us
Scott M. Graffius Contributed to and Reviewed the PMBOK Guide, 8th Edition — the Global Standard for Project Management
UK Sports Institute Features Teamwork and Leadership Work of Scott M. Graffius
Definitions of Advanced AIs: Agentic, Autonomous, and Autopoietic
HAN University of Applied Sciences Features the Work of Scott M. Graffius
Gifts That Inspire Joy
Evergreen Echoes: How Pinterest Inc. and Pinterest Japan Spotlighted Scott M. Graffius’ Research on the Half-Life of Social Media Content
Scott M. Graffius’ Team Development Work Lights Up the University of Tasmania’s Curriculum
Taiwan’s Leading Outlet for Technology and Innovation Spotlights Graffius’ Research on Social Media Temporal Dynamics
Scott M. Graffius’ Insights on AI, Agile, Gaming, XR, and Defense Transformation Cited by MSN in Their Coverage of Innovation and Leadership in the Sector
Top Predictions of 2024, Tested in 2025
Government of Finland Agency Features Graffius' Phases of Team Development IP
Scott M. Graffius Premieres His New "Exotic Team Dynamics: Human-AI Collaboration" Talk at Corporate Event in Las Vegas
Environmental Science Journal References Scott M. Graffius’ Project Management Work
AI Institute of Switzerland Features Scott M. Graffius’ Work on Algorithms
Exotic Team Dynamics: The New Frontier of Human–AI Collaboration
Scott M. Graffius’ Work Featured at ACM DIS ’25
Climbing the Ladder: The Head of Agile/PMO’s Organizational Proximity to the CEO is Closer Than Ever
Harness Sci-Fi and Speculative Design While Embracing Imperfection to Drive Innovation and Proactively Predict and Prepare for the Future
Scott M. Graffius’ “Agile Scrum” Book Featured in a Publication of the Associação Nacional de Educação Católica do Brasil (ANEC)
Setting Direction with OKRs and Tracking Progress with KPIs: A Guide for Agile, Project Management, and Tech Teams
AI Showcase Showdown: Ranking AI Accuracy on Project Management Basics
BookAuthority Features “Agile Scrum” by Scott M. Graffius in “10 Agile Software Development Books That Define the Field”
Exploring Team Dynamics, Adaptability, and Creative Problem-Solving Through Felix the Cat’s Metaphorical Toolkit
Mind Games and Master Plans: How PsyOps Exploit Psychological Phenomena
The “Pants-on-Fire Index for AI”
16 Causes of Technical Debt and How to Avoid It
PMI’s Infinity AI Gets the Basics of Team Development Alarmingly and Repeatedly Wrong
Agile for Unicorns: 7 Keys to Thrive; Scott M. Graffius’ Workshop
Scott M. Graffius’ “Agile Scrum: Your Quick Start Guide with Step-by-Step Instructions” Featured in Prestigious National Academies of Sciences Publication
Meta and Anduril’s EagleEye and the Future of XR: How Gaming, AI, and Agile Are Transforming Defense
"Agile Protocol" and the Power of Satire, Parody, and Humor
AI in Agile: Benefits, Risks, Outlook
Hostinger Highlights Scott M. Graffius’ “Agile Protocol” Book in Feature on Software Projects
French Ministry of Culture Links to Scott M. Graffius Research in Their Guide for Responsible Digital Communication
National Science Foundation’s LTER Network Features Scott M. Graffius’ Phases of Team Development IP
Waterfall vs. Agile: What’s Fixed, What’s Flexible, and Why It Matters
Scott M. Graffius Delivering $2.3 Billion in Value Through AI, Agile, and Project/PMO Leadership
The Problem with Heroes in Agile
The 3 Vital Rules of Science: What They Are and Why They Matter
“Agile Protocol: The Transformation Ultimatum” Lands on the Amazon Best Sellers List!
Scott M. Graffius Recognized as a Top Thought Leader in Digital Disruption by Thinkers360
“Agile Protocol: The Transformation Ultimatum” by Scott M. Graffius Crashes the Book Scene with Satirical Firepower
NCKU in Taiwan Integrates Graffius' 'Phases of Team Development' into Its Curriculum
The Art and Science of Aligning Initiatives with Strategic Objectives
RGPV University Adds Scott M. Graffius’ "Agile Scrum: Your Quick Start Guide with Step-by-Step Instructions" to Its Syllabus
Introducing ‘Engage or Fade: Decoding the Half-Life of Digital Resonance’ – A New Talk by Scott M. Graffius
Dropbox Company (Nira) Taps into Scott M. Graffius’ Expertise in Strategic Planning
Reporting Errors in a Publication: A Case Study on ‘Frontiers in Public Health’
NESEA Conference Session on Innovation Highlights Scott M. Graffius' 'Phases of Team Development'
U.S. Soccer Scores with Scott M. Graffius' Intellectual Property on Teamwork
U.S. Department of Commerce Partner (IEDC) Features Scott M. Graffius’ Intellectual Property
How Long Do Your Posts Live? AI Critiques Scott M. Graffius’ Research on the Half-Life of Social Media
Agile's Journey Through the Decades
Scott M. Graffius' Role in Advancing Project Management Institute (PMI) Standards Excellence
Most Valuable IT Certifications: Update for 2025
The PMI + Agile Alliance Merger: A Recipe for Success?
When Agile, AI, and Strategic Thinking Converge
Scott M. Graffius’ Phases of Team Development: 2025 Update
Lifespan (Half-Life) of Social Media Posts: Update for 2025
Verizon Features Scott M. Graffius
Do Not Read This Article! An Exploration of the Streisand Effect and Other Phenomena
Scott M. Graffius' 'Phases of Team Development' was Spotlighted in Journal of Neurosurgery
Pinterest Japan Uses Graffius’ Research on Temporal Dynamics on Social Media Platforms
Hochschule Coburg (Coburg University) Germany Uses Scott M. Graffius’ Phases of Team Development IP in Coursework on Agile Development
Wild World of Team Dynamics [Updated Two-Minute Video]
EU Europass Teacher Academy Features Scott M. Graffius’ ‘Phases of Team Development’ in Leadership Training
Side-by-Side Comparison of Retrospectives and Hot Washes
Constructor University 2024 Advanced Software Technology Handbook References Scott M. Graffius' Work on Team Dynamics
Strategies for Medical Team Success Featured Scott M. Graffius’ ‘Phases of Team Development’ Intellectual Property
SBG Neumark — Europe’s Largest Distribution Transformer Plant — Powers Up with Scott M. Graffius’ Intellectual Property
Scott M. Graffius’ Intellectual Property was Employed by the NHS — the Largest Single-Payer Healthcare System in Europe
Luxury Unwrapped: The Ultimate Holiday Gift Guide for Every Budget
Singapore Institute of Technology Features Work of Scott M. Graffius
Tufts University Features Scott M. Graffius 'Phases of Team Development' Intellectual Property
'Cat Herders': Retelling the Massive Success Story
Pennsylvania State Agency Used Scott M. Graffius' Intellectual Property
Copyright Infringement in a Book Published by AuthorHouse / Author Solutions / The Najafi Companies: Publisher Fails to Respond or Take Required Action
Pinterest Inc. References Scott M. Graffius’ Research
Bournemouth University Used Scott M. Graffius’ Intellectual Property
‘Comparative Methodological Guidelines: Handbook for Educators’ Violates Scott M. Graffius’ Copyright
Japan Backlog User Group Event Featured Scott M. Graffius’ ‘Phases of Team Development’
TurningWest's 'Trial'
Radio Silence from the American Association of Neurological Surgeons on Report of Blatant Plagiarism in Their ‘Journal of Neurosurgery’ Publication
Supplement to Graffius' 'Lifespan (Half-Life) of Social Media Posts' Research: Typical Engagement Distribution Pattern for Social Media Posts
How Algorithms Shape the User Experience on Social Media Platforms
Thinkers360 Named Scott M. Graffius a Top Thought Leader on Agile
More articles are listed here.

How to Cite This Article
Graffius, S. M. (2026, July 6). Scott M. Graffius Contributed to Seven Project Management Institute (PMI) Standards. ScottGraffius.com. https://scottgraffius.com/blog/files/scott-m-graffius-contributed-to-7-pmi-standards.html

Digital Object Identifier (DOI)
(Coming soon)

Content Acknowledgements
Project Management Institute (PMI) name, mark, and content are the property of PMI.
Graffius’ article includes limited excerpts of PMI publications, attributed and used under fair use doctrine for purposes of news reporting, commentary, and analysis.

Tags and Hashtags
- Agile Practice Guide
- AI in project management
- Enterprise agility
- PMBOK Guide
- PMI standards contributions
- Portfolio program project management (PPPM)
- Professional standards development
- Program management standards
- Project estimating
- Project management
- Project Management Institute (PMI)
- Work breakdown structure (WBS)
- #PMI
- #ProjectManagement
- #PMBOK
- #Agile
- #AI
- #ArtificialIntelligence
- #ProgramManagement
- #ProjectEstimating
- #WBS
- #FutureOfWork
- #Leadership

Post-Publication Notes
If there are any supplements or updates to this article after the date of publication, they will appear here.

Copyright
Copyright © Scott M. Graffius. All rights reserved.
Content on this site—including text, images, videos, and data—may not be used for training or input into any artificial intelligence, machine learning, or automatized learning systems, or published, broadcast, rewritten, or redistributed without the express written permission of Scott M. Graffius.